Wash. Admin. Code § 296-52-65010

Current through Register Vol. 24-21, November 1, 2024
Section 296-52-65010 - Manufacturer applicant information

The manufacturer applicant must provide the following information to the department:

(1) The reason the applicant wants to manufacture explosives.
(2) The manufacturing or processing location.
(3) The kind of explosives manufactured, processed, or used.
(4) The distance that the explosives manufacturing building is located, or intended to be located, from other buildings, magazines, inhabited buildings, railroads, highways, and public utility transmission systems.
(5) A site plan. The site plan must:
(a) Include the distance each manufacturing building is located from:
(i) Other buildings on the premises where people are employed;
(ii) Other occupied buildings on adjoining property;
(iii) Buildings where customers are served;
(iv) Public highways;
(v) Utility transmission systems.
(b) Demonstrate compliance with:
(i) Applicable requirements of the Washington State Explosives Act;
(ii) The separation distance requirements of this chapter.
(c) Identify and describe all natural or artificial barricades used to influence minimum required separation distances;
(d) Identify the nature and kind of work being performed in each building;
(e) Specify the maximum amount and kind of explosives or blasting agents to be permitted in each building or magazine at any one time.
(6) Information required by WAC 296-52-61010, License applicants must provide this information.
(7) Other pertinent information required by the department.

Wash. Admin. Code § 296-52-65010

Amended by WSR 17-16-132, Filed 8/1/2017, effective 9/1/2017

Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060. 05-08-110, § 296-52-65010, filed 4/5/05, effective 6/1/05. Statutory Authority: RCW 49.17.010, [49.17].040, and[49.17].050 . 02-03-125, § 296-52-65010, filed 1/23/02, effective 3/1/02.