Wash. Admin. Code § 296-400A-031

Current through Register Vol. 24-23, December 1, 2024
Section 296-400A-031 - How do I qualify for a temporary permit?

To qualify for a temporary permit, you must:

(1) Have an active state-issued journey level plumber, domestic pump specialty plumber, or a residential specialty plumber certificate;
(2) Give the department sufficient qualifying evidence for a journey level plumber, domestic pump specialty plumber, or a residential specialty plumber certificate of competency;
(3) Never have taken the journey level plumber, domestic pump specialty plumber, or a residential specialty plumber competency examination in Washington state; and
(4) Not be a trainee or an apprentice plumber.

Wash. Admin. Code § 296-400A-031

Amended by WSR 16-08-100, Filed 4/5/2016, effective 5/16/2016

Statutory Authority: RCW 18.106.040 and 18.106.140. 09-10-080, § 296-400A-031, filed 5/5/09, effective 6/5/09; 06-24-040, § 296-400A-031, filed 11/30/06, effective 12/31/06. Statutory Authority: RCW 18.106.040, 18.106.140, 2002 c 82, and 2003 c 399. 04-12-046, § 296-400A-031, filed 5/28/04, effective 6/30/04. Statutory Authority: RCW 18.106.040, 18.106.140, 2001 c 281, and chapter 18.106 RCW. 02-14-074, § 296-400A-031, filed 6/28/02, effective 7/1/02. Statutory Authority: Chapter 18.106 RCW. 98-13-126, § 296-400A-031, filed 6/17/98, effective 7/20/98. Statutory Authority: RCW 18.106.050, [18.106.]070, [18.106.]110, [18.106.]125,[18.106.]140 and [18.106.]270. 97-11-052, § 296-400A-031, filed 5/20/97, effective 6/30/97.