The employer must notify the operator of high-voltage lines when any operations are to be performed, tools or materials handled, or equipment is to be moved or operated within ten feet of any high-voltage line. All required safety measures must be completed before proceeding with any work that would reduce the clearance requirements of this section.
Wash. Admin. Code § 296-307-15012
97-09-013, recodified as § 296-307-15012, filed 4/7/97, effective 4/7/97. Statutory Authority: RCW 49.17.040,[49.17.]050 and [49.17.]060. 96-22-048, § 296-306A-15012, filed 10/31/96, effective 12/1/96.