Wash. Admin. Code § 296-19A-094
Statutory Authority: RCW 51.04.020, 51.04.030, 51.32.095, 51.32.099 and 51.32.0991 (2007 c 72). 08-06-058, § 296-19A-094, filed 2/29/08, effective 3/31/08.
Wash. Admin. Code § 296-19A-094
Statutory Authority: RCW 51.04.020, 51.04.030, 51.32.095, 51.32.099 and 51.32.0991 (2007 c 72). 08-06-058, § 296-19A-094, filed 2/29/08, effective 3/31/08.