Current through Register Vol. 24-23, December 1, 2024
Section 296-150T-0210 - What are the insignia requirements?(1) If you are applying for insignia for factory-built temporary worker housing structures you must have your design plan approved and your units inspected and approved by us.(2) We will attach the insignia after: (a) We receive the required forms and fees from you (see WAC 296-150T-3000 ); and(b) Your unit or component has passed final inspection. (See WAC 296-150T-0500.)Wash. Admin. Code § 296-150T-0210
Statutory Authority: RCW 43.22.480. 99-12-079, § 296-150T-0210, filed 5/28/99, effective 6/28/99.