DESIGN PLAN FEES: | |
STRUCTURAL ALTERATION | $229.80 |
RESUBMITTAL FEE | $101.30 |
ADDENDUM (Approval expires on the same date as original plan.) | $101.30 |
ELECTRONIC PLAN SUBMITTAL FEE $6.90 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |
DEPARTMENT INSPECTION FEES: | |
Combination permit - Mechanical and electrical inspections | $251.20 |
Heat pump | $251.20 |
Air conditioning | $251.20 |
Air conditioning with replacement furnace | $251.20 |
Gas furnace installation includes gas piping | $251.20 |
Fire safety inspection | $251.20 |
MECHANICAL | |
Gas*** piping | $111.50 |
Wood stove | $111.50 |
Pellet stove | $111.50 |
Gas*** Room heater | $111.50 |
Gas*** Decorative appliance | $111.50 |
Range: Changing from electric to gas*** | $111.50 |
Gas*** Water heater replacement | $83.40 |
ELECTRICAL | |
Electric water heater replacement | $139.50 |
Electric water heater replacing gas*** water heater | $139.50 |
Each added or modified 120 volt circuit (maximum charge is two circuits) | $139.50 |
Each added 240 volt circuit (for other than heat pumps, air conditioners, furnaces, water heaters, ranges, hot tubs or spas) | $139.50 |
Hot tub or spa (power from home electrical panel) | $139.50 |
Replace main electrical panel/permanently installed transfer equipment | $139.50 |
Low voltage fire/intrusion alarm | $139.50 |
Any combination of furnace, range and water heater changing from electric to gas*** | $139.50 |
PLUMBING | |
Fire sprinkler system | $313.70 |
Each added fixture | $83.40 |
Replacement of water piping system (this includes two inspections) | $280.10 |
STRUCTURAL | |
Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking) | $125.10 |
Reroofs (may require a plan review) | $223.70 |
Changes to home when additions bear loads on home per the design of a professional (also requires a plan review) | $223.70 |
Other structural changes (may require a plan review) | $223.70 |
MISCELLANEOUS | |
OTHER REQUIRED INSPECTIONS (per hour*) | $91.50 |
ALL REINSPECTIONS (per hour*) | $91.50 |
Manufactured home installation inspection permit (only available in cities and counties with L&I inspection contract) | $641.40 |
Refund | $27.50 |
INSIGNIA FEES: | |
REISSUED - LOST/DAMAGED | $27.50 |
IPIA | |
DEPARTMENT AUDIT FEES | |
REGULARLY SCHEDULED IPIA AUDIT: | |
First inspection on each section (one time only) | $45.80 |
Second and succeeding inspections of unlabeled sections (per hour*) | $101.30 |
OTHER IPIA FEES: | |
Red tag removal during a regularly scheduled IPIA audit (per hour* separate from other fees) | $101.30 |
Red tag removal at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $101.30 |
Increased frequency surveillance (per hour* plus travel time* and mileage**) | $101.30 |
Attendance at manufacturers training classes (per hour* only) | $101.30 |
Subpart "I" investigations (per hour* plus travel time* and mileage**) | $101.30 |
Alterations to a labeled unit (per hour* plus travel time* and mileage**) | $101.30 |
IPIA Issues/Responses (per hour* plus travel time* and mileage**) | $101.30 |
Monthly surveillance during a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $101.30 |
Monthly surveillance at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $101.30 |
Plant certifications, recertifications and addenda updates (per hour* plus travel time* and mileage** per each inspector) | $101.30 |
Response to HBT audit during a regularly scheduled IPIA audit (per hour*) | $101.30 |
Response to HBT audit at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $101.30 |
Alternative construction (AC) letter inspections at placement site (per hour* plus travel time* and mileage**) | $101.30 |
Replacement of HUD labels (per hour* plus travel time* and mileage**) | $101.30 |
State administrative agency (SAA) inspection fee (per hour* plus travel time* and mileage**) | $101.30 |
State administrative agency (SAA) dispute resolution filing fee | $101.30 |
State administrative agency (SAA) dispute resolution (per hour*) | $101.30 |
OTHER FEES: | |
FIELD TECHNICAL SERVICE (per hour plus travel time* and mileage**) | $94.20 |
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (one free copy per year upon request) | $18.40 |
VARIANCE INSPECTION FEE | $223.70 |
HOMEOWNER REQUESTED INSPECTION | $223.70 |
DECERTIFICATION OF A MOBILE/MANUFACTURED HOME | $223.70 |
DEMOLITION OF A MOBILE/MANUFACTURED HOME | $223.70 |
ENERGY CONSERVATION PERMIT | $37.80 |
NOTE: Local jurisdictions may have other fees that apply.
*Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**Per state guidelines.
***Gas means all gases; natural, propane, etc.
Wash. Admin. Code § 296-150M-3000
Statutory Authority: Chapter 43.22 RCW and 2011 1st sp.s. c 50. 12-06-069, § 296-150M-3000, filed 3/6/12, effective 4/30/12. Statutory Authority: Chapters 18.106, 43.22 RCW, 2008 c 285 and c 329. 08-12-042, § 296-150M-3000, filed 5/30/08, effective 6/30/08. Statutory Authority: Chapters 18.27, 18.106, 43.22, and 70.87 RCW. 07-11-128, § 296-150M-3000, filed 5/22/07, effective 6/30/07. Statutory Authority: Chapter 43.22 RCW. 07-05-063, § 296-150M-3000, filed 2/20/07, effective 4/1/07. Statutory Authority: Chapters 18.106, 43.22, and 70.87 RCW. 06-10-066, § 296-150M-3000, filed 5/2/06, effective 6/30/06. Statutory Authority: Chapter 43.22 RCW and 2005 c 399. 05-24-020, § 296-150M-3000, filed 11/29/05, effective 1/1/06. Statutory Authority: Chapters 18.27, 43.22, and 70.87 RCW. 05-12-032, § 296-150M-3000, filed 5/24/05, effective 6/30/05. Statutory Authority: Chapters 18.27 and 43.22 RCW. 04-12-048, § 296-150M-3000, filed 5/28/04, effective 6/30/04. Statutory Authority: RCW 43.22.340, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.480, and 43.22.485, 2002 c 268, and chapter 43.22 RCW. 03-12-044, § 296-150M-3000, filed 5/30/03, effective 5/30/03. Statutory Authority: RCW 43.22.350, 43.22.434, 43.22.480, 43.22.500, 18.27.070, 18.27.075, 70.87.030, 19.28.041, 19.28.051, 19.28.101, 19.28.121, 19.28.161, 19.28.201, 19.28.211, 19.28.341, 2001 c 159, and chapters 43.22, 19.28, 18.27, and 70.87 RCW. 01-12-035, § 296-150M-3000, filed 5/29/01, effective 6/29/01. Statutory Authority: RCW 43.22.340, 43.22.350, 43.22.355, 43.22.360, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.450, 43.22.480, and 43.22.485. 00-17-148, § 296-150M-3000, filed 8/22/00, effective 9/30/00. Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. 99-12-080, § 296-150M-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. 98-12-041, § 296-150M-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 70.87.030, 18.27.070, [18.27.]075, 43.22.350,[43.22.]355 , [43.22.]434 and [43.22.]480(2). 97-11-053, § 296-150M-3000, filed 5/20/97, effective 6/30/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360,[43.22.]432 , [43.22.]440 and [43.22.]480. 96-21-146, § 296-150M-3000, filed 10/23/96, effective 11/25/96.