Wash. Admin. Code § 296-150I-0200

Current through Register Vol. 24-23, December 1, 2024
Section 296-150I-0200 - Departmental assurance of installer compliance with the requirements of chapter 43.22A RCW

The department of labor and industries will ensure installers comply with the requirements of RCW 43.22A.130 which requires a certified manufactured home installer to be present for each phase of the installation being performed by all members of the installation crew by:

(1) Random site inspections of manufactured home installations and verification of installer certification and supervision;
(2) Investigations of complaints and violations reported to the department; and
(3) Audit of installers certification tag reports and usage.

Wash. Admin. Code § 296-150I-0200

Amended by WSR 22-01-193, Filed 12/21/2021, effective 1/31/2022

Statutory Authority: Chapter 43.22A RCW and 2009 c 464 [564]. 10-06-043, § 296-150I-0200, filed 2/23/10, effective 4/1/10. Statutory Authority: Chapter 43.22A RCW and 2007 c 432. 08-12-040, § 296-150I-0200, filed 5/30/08, effective 6/30/08.