Wash. Admin. Code § 296-104-105

Current through Register Vol. 24-20, October 15, 2024
Section 296-104-105 - Inspection - How much time is required for notification of an internal inspection?

Seven days will be considered sufficient notification. The owner or user shall prepare each boiler and unfired pressure vessel for internal inspection and shall prepare for and apply a hydrostatic pressure test whenever necessary on the date specified by the inspector.

Wash. Admin. Code § 296-104-105

Statutory Authority: RCW 70.79.030, 70.79.040, 70.79.150, 70.79.290, 70.79.330, and 70.79.350. 08-24-072, § 296-104-105, filed 12/1/08, effective 1/1/09. Statutory Authority: RCW 70.79.030 and 70.79.040. 99-22-026, § 296-104-105, filed 10/26/99, effective 11/26/99; 95-19-058, § 296-104-105, filed 9/15/95, effective 10/16/95; Part III, § 2, filed 3/23/60.