Current through Register Vol. 24-23, December 1, 2024
Section 230-16-030 - Step up punch board constructionManufacturers of step up boards must:
(1) Completely seal all cards, strips, or punches to prevent winner identification before the punch is removed from the board; and(2) Thoroughly mix all cards, strips, or punches that contain the winners to ensure that no pattern of winners exists; and(3) Have at least twenty-five different face sheets for use on boards with seals covering the winners; and(4) Randomly distribute face sheets during the manufacturing process.Wash. Admin. Code § 230-16-030
Statutory Authority: RCW 9.46.070. 07-19-069 (Order 615), § 230-16-030, filed 9/17/07, effective 1/1/08.