Proposing entities must address the following guidelines in proposing a design for a major work. Formal proposals prepared by proposing entities must include a description of how the design considers and responds to each of these guidelines. DES, CCDAC and SCC will use the following guidelines to evaluate and recommend or approve a final design selection.
Wash. Admin. Code § 200-230-070
Statutory Authority: 2011 c 43. 11-23-093, recodified as WAC 200-230-070, filed 11/17/11, effective 11/17/11. Statutory Authority: Chapter 43.34 RCW. 00-06-052, § 236-18-070, filed 2/28/00, effective 3/30/00. Statutory Authority: Chapter 43.34, 43.19 RCW and 1997 c 149 § 140(3). 98-01-112, § 236-18-070, filed 12/18/97, effective 1/18/98.