Wash. Admin. Code § 173-700-400

Current through Register Vol. 24-20, October 15, 2024
Section 173-700-400 - Monitoring plan
(1) The goals of monitoring bank sites are to:
(a) Document the postconstruction baseline conditions at the site;
(b) Document the condition of the site as it develops over time;
(c) Document the attainment of performance standards; and
(d) Provide early identification of problems in the site's development that would trigger potential adaptive management activities.
(2) The sponsor must develop a monitoring plan for each bank site and include it in the instrument. The monitoring plan must include, but is not limited to:
(a) A description of the variables that will be monitored, a description of the methods or protocols used to monitor those variables, and how they will be evaluated;
(b) The monitoring protocols must be sufficient to provide an accurate representation of site conditions;
(c) A schedule of monitoring including the time of year, frequency, and duration; and
(d) A description of proposed photo documentation of the site.

Wash. Admin. Code § 173-700-400

Statutory Authority: Chapter 90.84 RCW. 09-19-013 (Order 04-13), § 173-700-400, filed 9/3/09, effective 10/4/09.