January 1 to June 20: | 370 cfs |
June 20 to July 15: | Linear decrease from 370 cfs on June 20 to 130 cfs on July 15 |
July 15 to September 10: | 130 cfs |
September 10 to September 20: | Linear increase from 130 cfs on September 10 to 200 cfs on September 20 |
September 20 to October 1: | 200 cfs |
October 1 to October 10: | Linear increase from 200 cfs on October 1 to 370 cfs on October 10 |
October 10 to January 1: | 370 cfs |
Normal year flows must be maintained at all times unless a critical condition is declared by the director. If natural Cedar River flows fall below the 1 in 10 year Cedar River flow frequency, the director, or his designee, may authorize flows below the normal year flows, but not lower than the critical year flow except where a declaration of overriding considerations of public interest is made by the director. All requests to deplete below the established instream flow level will be considered on a case-by-case basis.
January 1 to June 15: | 250 cfs |
June 15 to July 1: | Linear decrease from 250 cfs on June 15 to 110 cfs on July 1 |
July 1 to October 1: | 110 cfs |
October 1 to November 1: | Linear increase from 110 cfs on October 1 to 250 cfs on November 1 |
November 1 to January 1: | 250 cfs |
Critical year flows represent flows below which the department believes substantial damage to instream values will occur. Critical year flows are expected to be met unless natural Cedar River flows fall below the one in fifty year Cedar River flow frequency.
Wash. Admin. Code § 173-508-060
Statutory Authority: Chapters 90.22 and 90.54 RCW. 79-10-002 (Order DE 79-9), § 173-508-060, filed 9/6/79.