Table 1 | |
Gasoline Throughput (millions of gallons) | Allowable Distance to the Property Line (meters) |
1.5 | 20 |
2.0 | 25 |
4.0 | 38 |
6.0 | 49 |
8.0 | 58 |
10.0 | 66 |
During the months of May, June, July, August, and September any failure of a vapor collection system at a bulk gasoline plant or gasoline loading terminal to comply with this section requires the discontinuation of gasoline transfer operations for the failed part of the system. Other transfer points that can continue to operate in compliance may be used. The loading or unloading of the transport tank connected to the failed part of the vapor collection system may be completed during the other months of the year.
Wash. Admin. Code § 173-491-040
Statutory Authority: RCW 70.94.165. 98-01-184 (Order 97-07), § 173-491-040, filed 12/23/97, effective 1/23/98. Statutory Authority: 1996 c 294. 97-04-012 (Order 95-15), § 173-491-040, filed 1/27/97, effective 2/27/97. Statutory Authority: RCW 70.94.331. 93-13-011 (Order 92-47), § 173-491-040, filed 6/7/93, effective 7/8/93; 91-14-101 (Order 90-63), § 173-491-040, filed 7/2/91, effective 8/2/91.