As part of a condition of approval of the notice of construction, the owner or operator of the incinerator shall develop a plan for the operation and maintenance of all equipment and procedures that can cause or control air pollution. This plan must be approved by ecology or the authority prior to initial startup or testing. Every twenty-four months thereafter, the owner or operator must obtain approval of a new or updated plan to continue operation. The plan may include operating parameters, maintenance procedures and operation personnel training requirements and procedures to assure that the source will comply with all applicable rules, resolutions, regulations, safety practices, and ordinances.
Wash. Admin. Code § 173-434-090
Statutory Authority: RCW 70.94.331. 90-19-062 (Order 90-10), § 173-434-090, filed 9/17/90, effective 10/18/90.