Fossil-fuel fired steam electric plants of more than 250 million British thermal units per hour heat input, | Coke oven batteries, |
Coal cleaning plants (thermal dryers), | Sulfur recovery plants, |
Kraft pulp mills, | Carbon black plants (furnace process), |
Portland cement plants, | Primary lead smelters, |
Primary zinc smelters, | Fuel conversion plants, |
Iron and steel mill plants, | Sintering plants, |
Primary aluminum ore reduction plants, | Secondary metal production facilities, |
Primary copper smelters, | Chemical process plants, |
Municipal incinerators capable of charging more than 250 tons of refuse per day, | Fossil-fuel boilers of more than 250 million British thermal units per hour heat input, |
Hydrofluoric, sulfuric, and nitric acid plants, | Petroleum storage and transfer facilities with a capacity exceeding 300,000 barrels, |
Petroleum refineries, | Taconite ore processing facilities, |
Lime plants, | Glass fiber processing plants, and |
Phosphate rock processing plants, | Charcoal production facilities. |
Wash. Admin. Code § 173-400-151
Statutory Authority: RCW 70.94.152. 05-03-033 (Order 03-07), § 173-400-151, filed 1/10/05, effective 2/10/05. Statutory Authority: Chapter 70.94 RCW, RCW 70.94.141,[70.94.]152, [70.94.]331, [70.94.]510 and 43.21A.080. 01-17-062 (Order 99-06), § 173-400-151, filed 8/15/01, effective 9/15/01. Statutory Authority: Chapter 70.94 RCW. 91-05-064 (Order 90-06), § 173-400-151, filed 2/19/91, effective 3/22/91.