This section specifies requirements for cleanup actions and the procedures for determining whether a cleanup action alternative meets those requirements.
When a cleanup action includes more than one cleanup action component, the overall cleanup action must meet the requirements in this subsection. Ecology recognizes that some of the requirements contain flexibility and require the use of professional judgment in determining how to apply them at a particular site.
* Estimate future costs using constant-year dollars; and
* Discount future costs using the current U.S. Treasury real interest rate for bonds of comparable maturity to the period of analysis. If project costs exceed 30 years, use the current U.S. Treasury 30-year real interest rate.
Wash. Admin. Code § 173-340-360
Statutory Authority: Chapter 70.105D RCW. 01-05-024 (Order 97-09A), § 173-340-360, filed 2/12/01, effective 8/15/01; 91-04-019, § 173-340-360, filed 1/28/91, effective 2/28/91; 90-08-086, § 173-340-360, filed 4/3/90, effective 5/4/90.