Where the proposed system using subsurface disposal has received a state construction grant or a federal construction grant under the Federal Water Pollution Control Act as amended, such a system is a "domestic wastewater facility" regardless of size.
The facility plan described in federal regulation 40 C.F.R. 35 is an "engineering report." This federal regulation describes the Environmental Protection Agency's municipal wastewater construction grants program.
Wash. Admin. Code § 173-240-020
Statutory Authority: RCW 90.48.110. 00-15-021 (Order 00-09), § 173-240-020, filed 7/11/00, effective 8/11/00. Statutory Authority: Chapters 43.21A and 90.48 RCW. 83-23-063 (Order DE 83-30), § 173-240-020, filed 11/16/83. Statutory Authority: RCW 90.48.110. 79-02-033 (Order DE 78-10), § 173-240-020, filed 1/23/79. Formerly WAC 372-20-010.