The following drills shall be conducted within each triennial cycle.
Type of Drill | Frequency Within the Triennial Cycle | Special Instructions | Scheduling Instructions |
Tabletop drills | 3 - One in each year of the cycle | One of the three shall involve a worst case discharge scenario. The worst case discharge scenario drill shall be conducted once every three years. | Must be scheduled at least 60 days in advance, except the worst case discharge scenario at least 90 days in advance. |
Deployment drills | 6 - Done two per year | These drills shall include, GRP deployments, testing of each type of equipment to demonstrating compliance with the planning standards. | Scheduled at least 30 days in advance. |
Ecology initiated unannounced drills | As necessary | This drill may involve testing any component of the plan, including notification procedures, deployment of personnel, boom, recovery and storage equipment and verification of ecology approved alternative vessel speeds. | No notice. |
ERTV Deployment Drill for covered vessels transiting the Strait of Juan de Fuca | 1 - One in each three year cycle, this is an additional deployment drill unless it is incorporated into a large multiobjective deployment drill. | This drill may involve notifications and tug call out, communications safety, tug demonstration of making up to, stopping, holding, and towing a drifting or disabled vessel and holding position within one hundred feet of another vessel. | Scheduled at least 30 days in advance. |
Credit for this drill may be achieved from a call out of the tug to a vessel emergency. | |||
Wildlife Deployment Drill | 1 - One in each three year cycle. This is an additional drill . | This drill will be a deployment of wildlife equipment and wildlife response service provider personnel. | Scheduled at least 90 days in advance. |
Multiple plan holder large scale equipment deployment drill | 1 - One in each three year cycle. | This drill may involve dedicated and nondedicated equipment, vessels of opportunity, multiple simultaneous tactics, responses to potentially non-floating oils, and the verification of operational readiness over multiple operational periods. | Scheduled at least 90 days in advance. |
Wash. Admin. Code § 173-182-710
Statutory Authority: Chapters 88.46, 90.48, 90.56 RCW, and 2011 c 122 . 13-01-054 (Order 11-06), § 173-182-710, filed 12/14/12, effective 1/14/13. Statutory Authority: Chapters 88.46, 90.56, and 90.48 RCW. 06-20-035 (Order 00-03), § 173-182-710, filed 9/25/06, effective 10/26/06.