Wash. Admin. Code § 173-180-221

Current through Register Vol. 24-23, December 1, 2024
Section 173-180-221 - Rate A prebooming and alternative measures requirements

This section generally applies to delivering facilities; however, any Class 1 facility receiving oil from a Rate A delivering vessel must provide the facility's approved safe and effective threshold values to the vessel.

(1) The Rate A deliverer must preboom oil transfers when it is safe and effective to do so. When prebooming is not safe and effective, the deliverer must meet the alternative measures requirements found in subsection (9) of this section and submit the Ecology Boom Reporting Form pursuant to subsection (4) of this section.
(2) The determination of safe and effective must be made prior to starting a transfer and reevaluated if conditions change before or during a transfer. To make this determination, the deliverer must use the safe and effective threshold values found in their operations manual. The safe and effective determination must be based on the conditions at the transfer location.
(3) When water currents are 1 knot or less, facilities must consider prebooming if it is safe to do so, even if the boom may be less than fully effective. When water currents are greater than 1 knot, facilities may consider prebooming based on the expected performance of the boom.
(4) When it is not safe and effective to preboom, or when conditions develop during a preboomed transfer that require removal of the boom, the Rate A deliverer must report this finding to ecology through the Ecology Boom Reporting Form. The form must include all observed and forecasted conditions that exceed the weather and safety values in the safe and effective threshold determination report. The form must be submitted on ecology's website or by email. Form number ECY 070-215 must be used. The form must be submitted prior to the transfer and/or immediately when conditions have changed.
(5) If a transfer is not preboomed due to conditions exceeding the safe and effective values, or if the boom is removed due to changing environmental conditions during the transfer, the Rate A deliverer must boom the transfer if it becomes safe and effective to do so. If environmental conditions continue to exceed safe and effective values, follow-up Ecology Boom Reporting Forms must be submitted every six hours for a transfer at a terminal.
(6) If multiple oil transfers are occurring simultaneously with a single vessel, and one product transferred is not appropriate to pre-boom, such as gasoline, aviation gasoline, ethanol, nonene, and other highly volatile products with similar characteristics, then that portion of the transfer where it is not appropriate to preboom must meet the alternative measures found in subsection (9) of this section. The portion of the transfer that is appropriate to preboom must be preboomed if:
(a) It is safe and effective to do so;
(b) Pumping is complete for the product that is not appropriate to preboom; and
(c) There are at least three hours remaining in the transfer.
(7) For the purposes of this section, the deliverer must be able to quickly disconnect all boom in the event of an emergency.
(8) Rate A prebooming requirements.
(a) In order to preboom transfers, the deliverer must have, prior to the transfer, access to boom four times the length of the largest vessel involved in the transfer or 2,000 feet, whichever is less.
(i) The deliverer must deploy the boom such that it completely surrounds the vessel(s) and facility/terminal dock area directly involved in the oil transfer operation, or the portion of the vessel and transfer area that provides for maximum containment of any oil spilled.
(ii) The boom must be deployed with a minimum stand-off of five feet away from the sides of a vessel, measured at the waterline. This stand-off may be modified for short durations needed to meet a facility or vessel's operational needs.
(iii) The deliverer must periodically check the boom positioning and adjust as necessary throughout the duration of the transfer and specifically during tidal changes and significant wind or wave events.
(b) In addition to prebooming, the deliverer must have the following available on-site:
(i) Enough sorbent materials and storage capacity for a seven barrel oil spill appropriate for use on water or land;
(ii) Containers suitable for holding the recovered oil and oily water; and
(iii) Nonsparking hand scoops, shovels, and buckets.
(c) For preboomed transfers, within one hour of being made aware of a spill, the deliverer must be able to complete deployment of the remaining boom as required in (a) of this subsection, should it be necessary for containment, protection, or recovery purposes.
(9) Rate A alternative measures. Rate A deliverers must use these alternative measures when it is not safe and effective to meet the prebooming requirements:
(a) Prior to starting the oil transfer operation, the deliverer must have access to boom four times the length of the largest vessel involved in the transfer or 2,000 feet, whichever is less.
(b) The deliverer must have the following available on-site:
(i) Enough sorbent materials and storage capacity for a seven barrel oil spill appropriate for use on water or land;
(ii) Containers suitable for holding the recovered oil and oily water; and
(iii) Nonsparking hand scoops, shovels, and buckets.
(c) The deliverer must have the ability to safely track the spill in low visibility conditions. The tracking system must be on-scene and ready to be deployed within 30 minutes of being made aware of a spill.
(d) Within one hour of being made aware of a spill, the deliverer must be able to completely surround the vessel(s) and facility/terminal dock area directly involved in the oil transfer operation with boom, or the portion of the vessel and transfer area that provides for maximum containment of any oil spilled.
(e) Within two hours of being made aware of a spill, the deliverer must have the following:
(i) Additional boom four times the length of the largest vessel involved in the transfer or 2,000 feet, whichever is less, available for containment, protection, or recovery; and
(ii) A skimming system must be on-site, in stand-by status, and be capable of 50 barrels recovery and 100 barrels of storage.

Wash. Admin. Code § 173-180-221

Amended by WSR 23-12-077, Filed 6/6/2023, effective 7/7/2023

Statutory Authority: RCW 88.46.160, 88.46.165, and chapter 90.56 RCW. 06-20-034 (Order 06-02), § 173-180-221, filed 9/25/06, effective 10/26/06.