Wash. Admin. Code § 173-175-230

Current through Register Vol. 24-23, December 1, 2024
Section 173-175-230 - Declaration of construction completion

Within sixty days following substantial completion of construction or modification of a dam, the project engineer shall submit to the department:

A declaration stating the project was constructed in accordance with the department approved plans and specifications and construction change orders.

The department will provide a declaration form which may be used or altered, as appropriate, by the project engineer.

Wash. Admin. Code § 173-175-230

Statutory Authority: RCW 43.21A.064, 43.21A.080, 86.16.061, 90.03.350 and [90.03].470. 04-16-122 (Order 03-08), § 173-175-230, filed 8/4/04, effective 9/4/04. Statutory Authority: RCW 43.21A.064, [43.21A.]080 and 86.16.061. 92-12-055 (Order 91-17), § 173-175-230, filed 6/1/92, effective 7/2/92.