Current through Register Vol. 24-23, December 1, 2024
Section 173-175-170 - Construction inspection plan(1) A detailed plan shall be submitted to the department describing how adequate and competent construction inspection will be provided.(2) The construction inspection plan shall be prepared by a professional engineer and shall bear his/her seal and signature.(3) The construction inspection plan shall include, as a minimum: (a) A listing of construction activities related to critical project elements and planned inspection effort including staffing levels, responsibilities, frequency, and duration of site visits;(b) A description of the quality assurance testing program which describes the type of test, general frequency, acceptable results, handling of deficient materials, and the individual(s) responsible for overseeing the testing;(c) Description of construction management organization, lines of communication, and responsibilities;(d) Description of the change order process including who is responsible for coordinating the change order review process with the department;(e) Description of the technical records handling and the content and frequency of construction progress reports.Wash. Admin. Code § 173-175-170
Statutory Authority: RCW 43.21A.064, [43.21A.]080 and 86.16.061. 92-12-055 (Order 91-17), § 173-175-170, filed 6/1/92, effective 7/2/92.