Wash. Admin. Code § 173-175-050

Current through Register Vol. 24-20, October 15, 2024
Section 173-175-050 - Provision of guidelines

The department will develop and maintain Dam Safety Guidelines to aid dam owners and project engineers in complying with the department requirements in developing, producing, or conducting:

(1) Engineering design reports;
(2) Plans and specifications;
(3) Construction inspection plans;
(4) Operation and maintenance plans;
(5) Periodic inspections; and
(6) Emergency action plans.

Wash. Admin. Code § 173-175-050

Statutory Authority: RCW 43.21A.064, [43.21A.]080 and 86.16.061. 92-12-055 (Order 91-17), § 173-175-050, filed 6/1/92, effective 7/2/92.