The department may require inspections and/or tests of withdrawal facilities prior to their use in order to ensure compliance with any construction requirements imposed by the department pursuant to this chapter. Such inspections and tests shall be performed at the expense of the holder of the permit, except that there shall be no charge for any portions of such tests or inspections which are performed by department employees. If it is the determination of the department that the facilities are not properly constructed or that the facilities may adversely affect the upper aquifers or upper aquifer zone, the department may (1) require further construction and/or testing of the facilities, or (2) require abandonment of the facilities in accordance with chapter 173-160 WAC, or (3) revoke the permit.
Wash. Admin. Code § 173-154-060
Statutory Authority: Chapters 90.44 and 90.54 RCW. 85-12-018 (Order 84-45), § 173-154-060, filed 5/29/85.