Geometric design of all RAP projects including all bridges shall, unless otherwise approved by the CRABoard, be in accordance with the city and county design standards for the construction of urban and rural arterials and collectors as currently adopted.
Wash. Admin. Code § 136-210-020
Statutory Authority: Chapter 36.79 RCW. 01-17-104, § 136-210-020, filed 8/21/01, effective 9/21/01. Statutory Authority: RCW 36.78.070 and 36.79.060. 96-17-013, § 136-210-020, filed 8/12/96, effective 9/12/96. Statutory Authority: Chapter 36.78 RCW. 84-16-065 (Order 56), § 136-210-020, filed 7/30/84.