RATA funds requested and allowed to a project are limited to the match requirements established by county road administration board policy following 36.79.120 RCW. The match requirements will be applied to the total eligible project development costs, which include preliminary engineering and construction costs in all regions, and non 2R project type right-of-way costs in the PSR, NWR, NER and SER.
Even though additional and eligible project development costs may be incurred by a county for a specific project, the maximum amount of RATA funds for that project is limited to the amount allocated and shown in the CRAB/county contract (see chapter 136-170 WAC), unless the allocation is increased pursuant to chapter 136-165 WAC.
Wash. Admin. Code § 136-161-090
Statutory Authority: Chapter 36.79 RCW. 07-17-020, § 136-161-090, filed 8/6/07, effective 9/6/07; 99-01-021, § 136-161-090, filed 12/7/98, effective 1/7/99; 98-09-070, § 136-161-090, filed 4/20/98, effective 5/21/98. Statutory Authority: RCW 36.79.060. 94-16-111, § 136-161-090, filed 8/2/94, effective 9/2/94.