Wash. Admin. Code § 136-161-060

Current through Register Vol. 24-23, December 1, 2024
Section 136-161-060 - RAP program cycle - Total project rating and priority array

County road administration board staff will review all final prospectuses and ensure that:

(1) All necessary information is included;
(2) The project is from the pool of preliminary prospectuses;
(3) The project is eligible for RATA funding;
(4) The project is on the current, adopted six-year transportation program;
(5) The project schedule indicates that preliminary engineering will begin not later than one year from the date of project approval by the county road administration board, and that the construction of the project will begin not later than six years from the date of project approval by the county road administration board; and
(6) The total project priority rating is mathematically correct and the visual rating scores determined during the field review are included.
(7) Existing and proposed roadway cross sections, project narrative, and preconstruction photos are attached.

After county road administration board staff review, all accepted final prospectuses within each region will be placed in a declining total project rating array. After review by the county road administration board at its next regular meeting, the priority array for each region will be provided to each county in the region. These arrays will be preliminary only and will be provided to the counties to assist them in their internal budgeting and programming. No notations as to whether a particular project will or will not be funded will be included.

Wash. Admin. Code § 136-161-060

Statutory Authority: Chapter 36.78 RCW. WSR 11-05-005, § 136-161-060, filed 2/3/11, effective 3/6/11. Statutory Authority: Chapter 36.79 RCW. WSR 99-01-021, § 136-161-060, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.78.070 and 36.79.060. WSR 96-17-013, § 136-161-060, filed 8/12/96, effective 9/12/96. Statutory Authority: RCW 36.79.060. WSR 94-16-111, § 136-161-060, filed 8/2/94, effective 9/2/94.