Model Rule, Increments of Progress
40 CFR 60.5085, What are my requirements for meeting increments of progress and achieving final compliance
40 CFR 60.5090, When must I complete each increment of progress
40 CFR 60.5095, What must I include in the notifications of achievement of increments of progress
40 CFR 60.5100, When must I submit the notifications of achievement of increments of progress
40 CFR 60.5105, What if I do not meet an increment of progress
40 CFR 60.5110, How do I comply with the increment of progress for submittal of a control plan
40 CFR 60.5115, How do I comply with the increment of progress for achieving final compliance
40 CFR 60.5120, What must I do if I close my SSI unit and then restart it
40 CFR 60.5125, What must I do if I plan to permanently close my SSI unit and not restart it
Model Rule, Operator Training and Qualification
40 CFR 60.5130, What are the operator training and qualification requirements
40 CFR 60.5135, When must the operator training course be completed
40 CFR 60.5140, How do I obtain my operator qualification
40 CFR 60.5145, How do I maintain my operator qualification
40 CFR 60.5150, How do I renew my lapsed operator qualification
40 CFR 60.5155, What if all the qualified operators are temporarily not accessible
40 CFR 60.5160, What site-specific documentation is required and how often must it be reviewed by qualified SSI operators and other plant personnel who may operate the unit according to the provisions of 40 CFR 60.5155(a)
Model Rule, Emission Limits, Emission Standards, and Operating Limits and Requirements
40 CFR 60.5165, What emission limits and standards must I meet and by when
40 CFR 60.5170, What operating limits and requirements must I meet and by when
40 CFR 60.5175, How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, activated carbon injection, or afterburner, or if I limit emissions in some other manner, to comply with the emission limits
40 CFR 60.5180, Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction
40 CFR 60.5181, How do I establish affirmative defense for exceedance of an emission limit or standard during malfunction
Model Rule, Initial Compliance Requirements
40 CFR 60.5185, How and when do I demonstrate initial compliance with the emission limits and standards
40 CFR 60.5190, How do I establish my operating limits
40 CFR 60.5195, By what date must I conduct the initial air pollution control device inspection and make any necessary repairs
40 CFR 60.5200, How do I develop a site-specific monitoring plan for my continuous monitoring systems, bag leak detection system, and ash handling system, and by what date must I conduct an initial performance evaluation of my continuous monitoring systems and bag leak detection system
Model Rule, Continuous Compliance Requirements
40 CFR 60.5205, How and when do I demonstrate continuous compliance with the emission limits and standards
40 CFR 60.5210, How do I demonstrate continuous compliance with my operating limits
40 CFR 60.5215, By what date must I conduct annual air pollution control device inspections and make any necessary repairs
Model Rule, Performance Testing, Monitoring, and Calibration Requirements
40 CFR 60.5220, What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards
40 CFR 60.5225, What are the monitoring and calibration requirements for compliance with my operating limits
Model Rule, Recordkeeping and Reporting
40 CFR 60.5230, What records must I keep
40 CFR 60.5235, What reports must I submit
Model Rule, Title V Operating Permits
40 CFR 60.5240, Am I required to apply for and obtain a Title V operating permit for my existing SSI unit
40 CFR 60.5245, When must I submit a Title V permit application for my existing SSI unit
Model Rule, Definitions
40 CFR 60.5250, What definitions must I know
TABLES
Table 2 to Subpart MMMM of 40 CFR Part 60, Model Rule, Emission Limits and Standards for Existing Fluidized Bed Sewage Sludge Incineration Units.
Table 3 to Subpart MMMM of 40 CFR Part 60, Model Rule, Emission Limits and Standards for Existing Multiple Hearth Sewage Sludge Incineration Units.
Table 4 to Subpart MMMM of 40 CFR Part 60, Model Rule, Operating Parameters for Existing Sewage Sludge Incineration Units.
Table 5 to Subpart MMMM of 40 CFR Part 60, Model Rule, Toxic Equivalency Factors.
Table 6 to Subpart MMMM of 40 CFR Part 60, Model Rule, Summary of Reporting Requirements for Existing Sewage Sludge Incineration Units.
9 Va. Admin. Code § 5-40-8370
Statutory Authority
§ 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.