"Combustion installation" means all combustion units within a stationary source in operation prior to October 5, 1979.
"Combustion unit" means any type of stationary equipment in which solid, liquid or gaseous fuels and refuse are burned, including, but not limited to, furnaces, ovens, and kilns.
"Heat input" means the total gross calorific value of all fuels burned.
"Manufacturing operation" means any process operation or combination of physically connected dissimilar process operations which is operated to effect physical or chemical changes or both in an article.
"Materials handling equipment" means any equipment used as a part of a process operation or combination of process operations which does not effect a physical or chemical change in the material or in an article, such as, but not limited to, conveyors, elevators, feeders or weighers.
"Physically connected" means any combination of process operations connected by materials handling equipment and designed for simultaneous complementary operation.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
"Rated capacity" means, the capacity as stipulated in the purchase contract for the condition of 100% load, or such other capacities as mutually agreed to by the board and owner using good engineering judgment.
"Total capacity" means with reference to a combustion installation, the sum of the rated capacities (expressed as heat input) of all units of the installation which must be operated simultaneously under conditions of 100% use load.
9 Va. Admin. Code § 5-40-250
Statutory Authority
§ 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act ( 40 CFR Parts 51 and 60).