9 Va. Admin. Code § 25-91-110

Current through Register Vol. 41, No. 4, October 8, 2024
Section 9VAC25-91-110 - Notifications
A. An owner or a duly authorized representative of the facility or AST shall notify the department within 30 days after any AST:
1. Upgrade;
2. Major repair;
3. Replacement (i.e., relocating or repositioning of an existing AST); or
4. Change in service (i.e., change in operation, conditions of the stored product, specific gravity, corrosivity, temperature or pressure that has occurred from the original that may affect the tank's suitability for service).
B. Notifications do not require a fee.

9 Va. Admin. Code § 25-91-110

Derived from Virginia Register Volume 14, Issue 18, eff. June 24, 1998; Amended, Virginia Register Volume 39, Issue 5, eff. 11/23/2022.

Statutory Authority: §§ 62.1-44.15, 62.1-44.34:15, 62.1-44.34:15.1, and 62.1-44.34:19.1 of the Code of Virginia.