Current through Register Vol. 41, No. 4, October 8, 2024
Section 9VAC25-820-30 - Relation to existing VPDES permits issued in accordance with 9VAC25-31A. This general permit shall control in lieu of conflicting or duplicative mass loading effluent limitations, monitoring or reporting requirements for total nitrogen and total phosphorus contained in individual VPDES permits for facilities covered by this general permit, where these requirements are based upon standards, criteria, waste load allocations, policy, or guidance established to restore or protect the water quality and beneficial uses of the Chesapeake Bay or its tidal tributaries.B. This general permit shall not control in lieu of more stringent water quality-based effluent limitations for total nitrogen or total phosphorus in individual permits where those limitations are necessary to protect local water quality, or more stringent technology-based effluent concentration limitations in the individual permit for any facility that has installed technology for the control of nitrogen and phosphorus whether by new construction, expansion, or upgrade.C. The compliance schedule in this general permit shall control in lieu of conflicting or duplicative schedule requirements contained in individual VPDES permits for facilities covered by this general permit, where those requirements address mass loading of total nitrogen or total phosphorus and are based upon standards, criteria, waste load allocations, policy, or guidance established to restore or protect the water quality and beneficial uses of the Chesapeake Bay or its tidal tributaries.9 Va. Admin. Code § 25-820-30
Derived from Virginia Register Volume 23, Issue 2, eff. November 1, 2006.Statutory Authority
§§ 62.1-44.15 and 62.1-44.19:14 of the Code of Virginia.