Note: *When the proposed pump station will be transferred to city ownership and operation, then this analysis will be made for the city-wide system. If the pump station is to remain under a private owner's control, then the analysis will be performed for that owner's system only.
**The number of portable pumps/generators required is the larger number of either A 4 a or A 4 b of this form.
***Portable equipment, either singly or in combination, shall be capable of operating the largest pump station included in the total for A 3 of this form.
Name
Title
Date
Note: *Time transpiring between high liquid level alarm and the time that an overflow or backup and subsequent discharge occurs (to be determined at peak design flow).
**Time transpiring between high liquid level alarm and connection and starting of portable equipment.
9 Va. Admin. Code § 25-790-990
Statutory Authority
§ 62.1-44.19 of the Code of Virginia.