The selection and operation of the sludge treatment or stabilization process shall be based on the ultimate utilization of the final sludge product. Land based management of treated sewage sludge may require the production of biosolids as described in the Virginia Pollution Abatement Permit Regulation (9VAC25-32) or Virginia Pollutant Discharge Elimination System Permit Regulation (9VAC25-31). The design requirements for the treatment and stabilization processes described in this chapter are based on the assumption that they must accomplish the necessary processing of sewage sludge at the treatment works. Consideration will be given to reducing design requirements, on a case-by-case basis, for treatment works employing series operation of two or more stabilization processes or methods in accordance with the means of sludge management. The standard buffer distance of 200 feet shall be provided between the walls of open and exposed sludge treatment operations and the boundaries of the site area in which either controlled use or access restrictions apply.
9 Va. Admin. Code § 25-790-540
Statutory Authority
§ 62.1-44.15 of the Code of Virginia.