A preliminary conference with the appropriate area engineer as specified will be held within 15 days of the owner's request for the meeting for proposed treatment works and pump station designs to establish the requirements for submission of the information necessary for a determination by the director relating to the issuance of a CTC. The applicant's engineer shall be prepared to set forth the sewage collection or treatment problems and the proposed solution in such a manner as to support the conclusions and recommendations presented at this meeting. A preliminary engineering proposal may be submitted prior to, during, or following the preliminary conference. Minutes of the meeting shall be recorded and distributed to the concerned parties.
9 Va. Admin. Code § 25-790-100
Statutory Authority
§ 62.1-44.19 of the Code of Virginia.