Virginia estimated the loadings from industrial stormwater facilities using actual and estimated facility acreage information and total phosphorus (TP) and total nitrogen (TN) loading rates from the Northern Virginia Planning District Commission (NVPDC) Guidebook for Screening Urban Nonpoint Pollution Management Strategies (Annandale, VA November 1979), prepared for the Metropolitan Washington Council of Governments. The loading rates used were as follows:
TP - High (80%) imperviousness industrial; 1.5 lb/ac/yr
TN - High (80%) imperviousness industrial; 12.3 lb/ac/yr
Actual facility area information and TP and TN data collected for facilities subject to Part V of this permit will be used by the department to quantify the nutrient and sediment loads from those VPDES permitted industrial stormwater facilities.
Owners shall maintain documentation of their demonstration of compliance with the Chesapeake Bay TMDL loading rates with the SWPPP and shall continue implementing any BMPs that may have been developed as part of that demonstration.
Documentation may include:
Facilities may use the applicable sampling data collected during the 2019 industrial stormwater general permit term to satisfy all or part of the four monitoring periods requirement in accordance with Part V A 2 c.
Facilities may use the applicable sampling data collected during the 2019 industrial stormwater general permit term to satisfy all or part of the four monitoring periods requirements in accordance with Part V A 3.
Owners of facilities in the Chesapeake Bay watershed that obtain initial coverage under the 2024 industrial stormwater general permit shall monitor their discharges for TN and TP to characterize the contributions from their facility's specific industrial sector for these parameters. Total nitrogen is the sum of total Kjeldahl nitrogen (TKN) and nitrite + nitrate and shall be Derived from the results of those tests. After the facility is granted coverage under the permit, samples shall be collected during each of the first four quarters of permit coverage. Samples shall be collected and analyzed in accordance with Part V B. Monitoring results shall be reported in accordance with Part V C and Part II C, and retained in accordance with Part II B. Calculations utilizing the procedures in Part V D and a Chesapeake Bay TMDL action plan if required under Part V E shall be submitted no later than 60 days following the completion of the fourth quarterly monitoring period to the DEQ regional office serving the area where the industrial facility is located on a form provided by the department. Reductions, if applicable, shall be achieved by two years following the end of the fourth quarterly monitoring period, and an annual report shall be submitted to the department by June 30 of each year describing the progress in meeting the required reductions until such time that the demonstration is completed. The demonstration shall be submitted to the department no later than the 10th of the month directly following the two year period. Documentation of compliance with the Chesapeake Bay TMDL loading rates shall be maintained with the SWPPP.
The grab sample shall be taken during the first 30 minutes of the discharge. If it is not practicable to take the sample during the first 30 minutes, the sample may be taken during the first three hours of the discharge, provided that the permittee explains why a grab sample during the first 30 minutes was impracticable. This information shall be submitted in the department's electronic discharge monitoring report (e-DMR) system and maintained with the SWPPP. If the sampled discharge commingles with process or nonprocess water, the permittee shall attempt to sample the stormwater discharge before it mixes with the nonstormwater.
Table 400-1 Monitoring Reporting Requirements | |
Quarterly Chesapeake Bay TMDL Monitoring | Submit the results by January 10, April 10, July 10, and October 10 |
Permittees required to collect nutrient and sediment data in accordance with Part V A 2 or A 3 shall analyze the data collected to determine if pollution reductions are required. The permittee shall average the data collected at the facility for each of the pollutants of concern (POC) (e.g., TP and TN) and compare the results to the loading rates for TP and TN presented in Part V A.
The following formula may be used to determine the loading rate:
L = 0.226 x P x Pj x (0.05 + (0.9 x Ia)) x C
where:
L = the POC loading rate (lb/acre/year)
P = the annual rainfall (inches/year) - The permittee may use either actual annual average rainfall data for the facility location (in inches/year), the Virginia annual average rainfall of 44.3 inches/year, or another method approved by the department.
Pj = the fraction of annual events that produce runoff - The permittee shall use 0.9 unless the department approves another rate.
Ia = the impervious fraction of the facility impervious area of industrial activity to the facility industrial activity area.
C = the POC average concentration of all facility samples (mg/L) - Facilities with multiple outfalls shall calculate a weighted average concentration for each outfall using the drainage area of each outfall.
For total phosphorus, all daily concentration data below the quantitation level (QL) for the analytical method used shall be treated as half the QL. All daily concentration data equal to or above the QL for the analytical method used shall be treated as it is reported.
For total nitrogen, if none of the daily concentration data for the respective species (i.e., TKN, nitrate, or nitrite) are equal to or above the QL for the respective analytical methods used, the daily TN concentration value reported shall equal one half of the largest QL used for the respective species. If one of the data is equal to or above the QL, the daily TN concentration value shall be treated as that data point is reported. If more than one of the data is above the QL, the daily TN concentration value shall equal the sum of the data points as reported.
Calculations shall be submitted to the department within 60 days from the end of the last monitoring period that satisfies the monitoring requirements in Part V A 2 or A 3. Calculations shall be submitted to the DEQ regional office serving the area where the industrial facility is located, on a form provided by the department, and maintained with the facility's SWPPP.
Alternative calculations may be accepted on a case by case basis by the department to accommodate facilities with outfalls that rarely discharge.
The Chesapeake Bay TMDL action plan shall be submitted on a form provided by the department to the regional office serving the area where the industrial facility is located within 60 days following the completion of the fourth quarterly monitoring period. A copy of the current Chesapeake Bay TMDL action plan and all facility loading rate calculations shall be maintained with the facility's SWPPP. The Chesapeake Bay TMDL action plan shall include:
9 Va. Admin. Code § 25-151-400
Statutory Authority: § 62.1-44.15 of the Code of Virginia; § 402 of the Clean Water Act; 40 CFR Parts 122, 123, and 124