Current through Register Vol. 41, No. 4, October 8, 2024
Section 9VAC20-81-400 - ApplicabilityA. No person shall construct, operate, or modify a solid waste management facility in the Commonwealth without a permit issued by the director unless otherwise specified in subsection D of this section or 9VAC20-81-410.B. Each solid waste management facility permit shall be limited to one site and shall be nontransferable between sites.C. Issuance of a new permit is required when there is:1. Any new solid waste management facility;2. Any change in design or process of a solid waste management facility that will, in the opinion of the director, result in a substantially different type of facility;3. Any expansion beyond the facility boundary, expansion of the waste management boundary or increase in the capacity of the facility (includes expansions) specified in the existing permit; or4. Any expansion beyond the facility boundary for remedial purposes. However, for these types of expansions, which do not provide for additional capacity, the expansion will be considered a permit modification for the purpose of establishing permit fees under the provisions of 9VAC20-90.D. The director may grant a variance from any provision contained in this part to a permittee provided the requirements of Part VII (9VAC20-81-700 et seq.) of this chapter are met.9 Va. Admin. Code § 20-81-400
Derived from Virginia Register Volume 27, Issue 12, eff. March 16, 2011.Statutory Authority
§ 10.1-1402 of the Code of Virginia; 42 USC § 6941 et seq.; 40 CFR Part 258.