Current through Register Vol. 41, No. 4, October 8, 2024
Section 9VAC20-130-173 - Maintenance of solid waste management plansA. Solid waste management planning units are required to maintain current solid waste management plans containing a 20-year planning window.B. On or before each five-year anniversary of the department's plan approval date, the planning unit shall submit a letter to the department, by mail or electronic mail, certifying that the following plan elements listed in 9VAC20-130-120 C have been maintained and updated: 1. Waste generation estimates are current (9VAC20-130-120 C 3);2. The schedule increments have been met (9VAC20-130-120 C 5); and3. A projected 20-year waste management capacity remains available or projects otherwise are on schedule to meet the planning unit's solid waste needs (9VAC20-130-120 C 9).C. The letter of certification submitted in accordance with subsection B of this section shall be used in the department's assessment of whether any plan amendments are necessary and to ensure compliance with 9VAC20-130-110 E.D. If revisions to the plan are needed, solid waste management planning units shall amend the plan as described in 9VAC20-130-175.9 Va. Admin. Code § 20-130-173
Derived From, Virginia Register Volume 35, Issue 09, eff. 2/7/2019.Statutory Authority: § 10.1-1411 of the Code of Virginia; 42 USC § 6942(b); 40 CFR Parts 255 and 256.