Prior to approval of a permit application, all maps and plans shall be reviewed at the proposed mining site with the inspector.
4 Va. Admin. Code § 25-31-90
Statutory Authority
§§ 45.1-161.3 and 45.1-180.3 of the Code of Virginia.
Prior to approval of a permit application, all maps and plans shall be reviewed at the proposed mining site with the inspector.
4 Va. Admin. Code § 25-31-90
Statutory Authority
§§ 45.1-161.3 and 45.1-180.3 of the Code of Virginia.