A permittee wishing to convert a coalbed methane gas well to a vertical ventilation hole shall first obtain approval from the Chief of the Division of Mines and submit a written request to the division for a permit release. The director shall consult with the chief, or his designated agent, before approving permit release.
4 Va. Admin. Code § 25-150-650
Statutory Authority
§§ 45.1-161.3 and 45.1-361.27 of the Code of Virginia.