However, in all cases, the right-of-way required for the road at its complete stage of construction shall be dedicated and accepted as part of the initial street acceptance. In addition, the initial phase of construction shall be designed and constructed to facilitate construction of the remaining phase in a manner that will avoid the need to reconstruct the initial two lanes.
Consideration for the acceptance of any street under the provisions of this section shall be limited to the phased development of only the street's roadway. All other applicable requirements, e.g., public benefit, drainage easements, and administrative procedures, shall apply.
24 Va. Admin. Code § 30-92-80
Statutory Authority
§ 33.1-70.3 of the Code of Virginia; Chapter 870 of the 2011 Acts of Assembly.
The amended version of this section by Virginia Register Volume 40, Issue 19, eff. 5/6/2024 is not yet available.