24 Va. Admin. Code § 30-92-140

Current through Register Vol. 41, No. 8, December 2, 2024
Section 24VAC30-92-140 - Surety and fees
A. Policy. Except as otherwise provided herein, the developer shall provide surety to guarantee the satisfactory performance of the street, an inspection fee to cover the department's cost of inspecting the new street, and an administrative cost recovery fee to recover the department's costs associated with the review of subdivision or other development plans and the administrative processing of the acceptance of new streets as determined in this section. All surety and fees collected under this section shall be based on the date of the local governing body's request and the aggregate mileage of new streets in that request, rounded up to the next tenth of a mile. In the event of extenuating circumstances beyond the developer's control, the commissioner or his designee may waive all or a portion of any of the surety and fees.
B. Surety. The department reserves the right to inspect, or have inspected, the street proposed for acceptance into the secondary system of state highways at any stage of construction and prior to street acceptance. The developer, contractor, and third-party inspector, if applicable, shall cooperate with the assigned VDOT personnel to provide the access and information necessary to verify that construction of the street is in accordance with the street's approved design and appropriate standards and specifications. A determination by the district administrator's designee that the required cooperation has not been extended shall be grounds for VDOT to refuse to accept the street for maintenance as part of the secondary system of state highways. A determination of noncooperation may be appealed as specified by this chapter (see 24VAC30-92-110) .
1. Type of surety and expiration. The developer shall provide surety to guarantee the satisfactory performance of the street. In the event the developer fails to provide surety or any of the fees described in this section within the 30-day period following the local governing body's request for the department to accept the maintenance of a street, the department's or other entity's previous final inspection of the street shall be considered void and a new inspection shall be required. An acceptable surety may be in the form of a performance bond, cash deposit, certified check, irrevocable letter of credit, third-party escrow account, or other form mutually satisfactory to the department and the developer. Under no circumstances shall the department or any agency of the Commonwealth be named the escrow agent nor shall funds deposited with the department as surety be subject to the payment of interest.
a. Amount of surety. The surety shall be $3,000 for each tenth of a lane mile, or portion thereof, to be accepted by the department for maintenance as part of the secondary system of state highways. The Commonwealth Transportation Board may adjust the surety on an annual basis based on increases or decreases in the producer price index for highway and street construction materials up to an amount not to exceed $5,000 for each tenth of a lane mile or portion thereof.
b. Length of surety. The surety shall guarantee performance of the street for one year from the date of its acceptance into the secondary system of state highways.
2. Alternatives to surety.
a. In jurisdictions where the staff of the governing body administers a comprehensive street construction inspection program that has been approved by the department, the surety shall be waived upon certification by the governing body that the proposed addition has been constructed in accordance with approved plans and specifications.
b. If requested by the developer and subject to availability of departmental personnel or consultants, VDOT may perform the construction inspection equivalent to that required for third-party inspection of any street or streets proposed to be added to the secondary system of state highways. In such cases, the developer shall bear all costs incurred by the department, the surety shall be waived, and no street inspection fee pursuant to subsection D of this section shall be charged.
c. A third-party inspection process shall be acceptable to the department if:
(1) The developer or construction contractor arranges for a firm not otherwise related to the developer or contractor to provide inspection services for the construction of the streets in the development;
(2) Inspection and testing methodology and frequency are accomplished in accordance with VDOT Materials Division's Manual of Instructions, 2011 and the Virginia Department of Transportation Road and Bridge Specifications, 2007, revised 2011; and
(3) A report is submitted to the department summarizing the inspections steps taken, certifying the results of the inspection and testing as accurate, and confirming that the street or streets were built to the approved specifications and pavement design, signed and stamped by a professional engineer licensed to practice as such in the Commonwealth.
C. Administrative cost recovery fee.
1. Application of the administrative cost recovery fee. To recover a portion of the department's direct costs associated with the review of plans or plans of development, and the administrative processing of the acceptance of new streets, an administrative cost recovery fee shall be required from the developer at the time the streets are accepted by the department. The amount of this cost recovery fee shall be computed at a base rate of $500 per addition, without regard to street length, plus $250 per tenth of a centerline mile, or portion thereof.
2. Alternatives to the administrative cost recovery fee. As an alternative to the administrative cost recovery fee, the department may use one of the following approaches to recover its direct costs:
a. For any development, at the developer's request, the department may establish an account for the purpose of tracking these costs and billing the developer not more often than every 30 days;
b. For large, complex, multiuse developments, the department, at its option, may establish an account for the purpose of tracking these costs and billing the developer not more often than every 30 days. However, the cost recovery fee assessed under this provision shall not be greater than two times the prevailing administrative cost recovery fee structure; or
c. If requested to provide plan review for streets that are not intended for maintenance by the department, the department may establish an account for the purpose of tracking these costs and billing the developer not more often than every 30 days.
D. Street inspection fee. To recover a portion of the department's direct costs associated with the inspection of subdivision streets, an inspection fee shall be required from the developer at the time the streets are accepted by the department.

The inspection fee shall be computed at a base rate of $250 per addition, without regard to street length, plus $125 per tenth of a centerline mile, or portion thereof.

The street inspection fee shall be reduced by 75% if either a third-party inspection process pursuant to subdivision B 2 c of this section or a local street inspection certification process pursuant to subdivision B 2 a of this section was used.

If requested to provide inspection services for subdivision streets that are not intended for maintenance by the department, the department may establish an account for the purpose of tracking these costs and billing the developer not more often than every 30 days.

24 Va. Admin. Code § 30-92-140

Derived from Virginia Register Volume 25, Issue 15, eff. March 9, 2009; Errata, 25:16 VA.R. 2978 April 13, 2009; amended, Virginia Register Volume 28, Issue 8, eff. December 31, 2011.

Statutory Authority

§ 33.1-70.3 of the Code of Virginia; Chapter 870 of the 2011 Acts of Assembly.

The amended version of this section by Virginia Register Volume 40, Issue 19, eff. 5/6/2024 is not yet available.