Activity | Fee |
Private Entrances | none |
Commercial Entrance | $150 for first entrance $50 for each additional entrance |
Street Connection | $150 for first connection $50 for each additional connection |
Temporary Logging Entrance | $10 for each entrance |
Temporary Construction Entrance | $10 for each entrance |
Turn Lane | $10 per 100 linear feet |
Crossover | $500 per crossover |
Traffic Signal | $1,000 per signal installation |
Reconstruction of Roadway | $10 per 100 linear feet |
Curb and Gutter | $10 per 100 linear feet |
Sidewalk | $10 per 100 linear feet |
Tree Trimming (for outdoor advertising) | in accordance with § 33.2-1221 of the Code of Virginia |
Tree Trimming (all other activities) | $10 per acre or 100 feet of frontage |
Landscaping | $10 per acre or 100 feet of frontage |
Storm Sewer | $10 per 100 linear feet |
Box Culvert or Bridge | $5 per linear foot of attachment |
Drop Inlet | $10 per inlet |
Paved Ditch | $10 per 100 linear feet |
Under Drain or Cross Drain | $10 per crossing |
Above-ground Structure (including poles, pedestals, fire hydrants, towers, etc.) | $10 per structure |
Pole Attachment | $10 per structure |
Span Guy | $10 per crossing |
Additive Guy and Anchor | $10 per guy and anchor |
Underground Utility - Parallel | $10 per 100 linear feet |
Overhead or Underground Crossing | $10 per crossing |
Excavation Charge (including Test Bores and Emergency Opening) | $10 per opening |
Two Month Commuter Lot Mobile Food Vending (available in Planning District 8 only) (weekdays and weekends) | $150 |
Single Weekend Commuter Lot Mobile Food Vending (available in Planning District 8 only) (per weekend) | $10 |
24 Va. Admin. Code § 30-151-710
Statutory Authority: § 33.2-210 of the Code of Virginia.