Current through Register Vol. 41, No. 8, December 2, 2024
Section 18VAC15-30-490 - Initial training criteria for lead project designerThe lead project designer course shall last a minimum of eight hours and shall address the following topics:
1. Role and responsibilities of a project designer.2. Development and implementation of an occupant protection plan for large scale abatement projects.3. Lead-based paint abatement and lead-based paint hazard reduction methods for large scale abatement projects.4. Interior dust abatement/clean-up or lead hazard control and reduction methods for large scale abatement projects.5. Clearance standards and testing for large scale abatement projects.6. Integration of lead-based paint abatement methods with modernization and rehabilitation projects for large scale abatement projects.18 Va. Admin. Code § 15-30-490
Derived from Virginia Register Volume 13, Issue 2, eff. November 13, 1996; amended, Virginia Register Volume 19, Issue 24, eff. October 1, 2003.Statutory Authority
§ 54.1-501 of the Code of Virginia.