12 Va. Admin. Code § 5-640-262

Current through Register Vol. 41, No. 6, November 4, 2024
Section 12VAC5-640-262 - Statements required upon completion of construction
A. Upon completion of the construction, alteration, or rehabilitation of a discharging system, the owner or agent shall submit to the department a completion statement signed by the contractor responsible for the construction and a completion statement signed by the licensed professional engineer responsible for the design, upon forms approved by the department, that the system was installed and constructed in accordance with the construction permit and complies with all applicable state and local regulations, ordinances, and laws. These completion statements shall be based upon inspections of the treatment works during and after construction or modification that are adequate to ensure the truth of the statements. Should the treatment works be modified from the approved construction plan, the licensed professional engineer shall submit as built drawings documenting the changes. The licensed professional engineer's completion statement shall certify that the treatment works as modified will comply with all applicable state and local regulations, ordinances, and laws.
B. No discharging system shall be placed in operation, except for the purposes of testing the mechanical soundness of the system, until an operation permit is issued by the department in accordance with 12VAC5-640-266.

12 Va. Admin. Code § 5-640-262

Derived From Virginia Register Volume 32, Issue 06, eff. 12/16/2015.

Statutory Authority: §§ 32.1-12 and 32.1-164 of the Code of Virginia.