12 Va. Admin. Code § 5-421-3595

Current through Register Vol. 41, No. 6, November 4, 2024
Section 12VAC5-421-3595 - Conformance with approved procedures

If the commissioner or the commissioner's designee grants a variance as specified in 12VAC5-421-3570, or a HACCP plan is otherwise required as specified under 12VAC5-421-3620, the permit holder shall:

1. Comply with the HACCP plans and procedures that are submitted as specified under 12VAC5-421-3630 and approved as a basis for the variance;P and
2. Maintain and provide to the department, upon request, records specified under subdivisions 4 and 5 c of 12VAC5-421-3630 that demonstrate that the following are routinely employed:
a. Procedures for monitoring the critical control points;PF
b. Monitoring of the critical control points;PF
c. Verification of the effectiveness of the operation or process;PF and
d. Necessary corrective actions if there is failure at the critical control point. PF

12 Va. Admin. Code § 5-421-3595

Derived from Virginia Register Volume 37, Issue 18, eff. 6/10/2021.

Statutory Authority: §§ 35.1-11 and 35.1-14 of the Code of Virginia.