Section 4.510 Size and Hazard Classifications(A) Dams shall be categorized by size. The size category shall be determined by height or storage, whichever gives the larger size category. The height of a dam and its storage shall both be established with respect to its maximum storage potential, measured from the natural bed of the water course to the maximum water storage elevation. For the purpose of determining size category, the maximum water storage elevation shall be considered to be the height above streambed as defined in section 4.521(B). Category | Storage (ac-ft) | Height (ft) |
Small | <1,000 | <40 |
Medium | =/> $ 1,000 and <50,000 | =/>$ 40 and <100 |
Large | =/> $ 50,000 | =/>$ 100 |
(B) Dams shall also be classified by hazard potential. The hazard potential classification of a dam pertains to potential loss of human life or property damage in the area downstream of the dam in the event of failure of the dam. Hazard Class | Potential Loss of Life | Potential Economic Loss |
Minimal | None expected | None expected |
Low | None expected (no permanent structures for human habitation) | Minimal (undeveloped to occaisional structures or agriculture) |
Significant | Few (no urban development and no more than a small number of inhabitable structures) | Appreciable (notable agriculture, industry, or structures) |
High | More than a few | Excessive (extensive community, industry, or agriculture) |
(C) At the request of its owner or operator, a dam which both impounds less than fifty acre-feet and is less than twenty-five feet tall may be placed in the 'Minimal' hazard class for purposes of this rule. A dam which is less than six feet tall or which has a maximum storage potential of less than fifteen acre-feet shall be classified in the 'Mnimal' hazard class, unless reclassified pursuant to paragraph (D).(D) Any dam may be reclassified to another hazard class by means of a petition brought by the owner or operator of the dam, the Department of Public Service, on the Commission's own motion, or by a petition brought pursuant to section 1095 of Title 10 of the Vermont Statutes Annotated. A proceeding based upon such a petition shall be a contested case for purposes of Chapter 25 of Title 3 of the Vermont Statutes Annotated.(E) Unless classified or reclassified pursuant to paragraphs (C) or (D), a dam shall be classed in the same hazard class to which it is assigned by the U.S. Army Corps of Engineers on its inventory made pursuant to the National Dam Inspection Act, Public Law 92-367. If a dam is not included in the inventory, it shall be placed in the Low hazard class if it is of Small size, in the Significant hazard class if it is of Medium size, and in the High hazard class if it is of Large size. Classifications of such non-inventoried dams shall be reviewed by the Commission as soon as practicable.Section 4.515 InventoryThe Commission shall maintain at its offices an inventory of all dams in the state which are subject to the Commission's regulatory jurisdiction under 10 V.S.A. § 1105. It shall be the duty of each owner or operator, upon request, to inspect such inventory and inform the Commission of any inaccuracies or omissions. In addition, it shall be a continuing duty of each owner or operator to inform the Commission of any change made to the height, storage, installed capacity, or ownership of a dam.
Section 4.520 Safety InspectionSection 4.521 Definitions For purposes of this Rule:
(A) "Independent consultant" means any person who:(1) Is approved by the Federal Energy Regulatory Commission to do inspections pursuant to 18 C.F.R. Chapter I Part 12 Subpart D.; and(2) Is not, and has not been within two years before being retained to perform an inspection under this subpart, an employee of the owner or operator or its affiliates or an agent acting on behalf of the owner or operator or its affiliates. Having been retained to perform an inspection shall not constitute having been an employee or agent.(B) "Height above streambed" means: (1) For a dam with a spillway, the vertical distance from the lowest elevation of the natural streambed at the downstream toe of the dam to the maximum water storage elevation possible without any discharge from the spillway. The maximum water storage elevation is the elevation of the spillway crest or the top of any gates or flashboards, whichever is higher. If the spillway is determined to be inadequate, under standards of or accepted by the U. S. Army Corps of Engineers, the maximum water storage elevation will be the elevation of the non-overflow section of the top of the dam;(2) For a dam without a spillway, the vertical distance from the lowest elevation of the natural streambed at the downstream toe of the dam to the lowest point on the crest of the dam.(C) "Dam" means any barrier (including its appurtenant structures and adjacent supporting natural features) constructed across a waterway to control the flow or raise the level of water, or behind which water is impounded or pumped for later release, over which the Commission has jurisdiction pursuant to Chapter 43 of Title 10 of Vermont Statutes Annotated.Section 4.522 Applicability(A) Safety Inspection shall be required of any dam:(1) That is more than twenty-five feet in height above streambed or that has a gross storage capacity of more than 750 acre-feet; or(2) That has a significant or high hazard potential or is determined by the Commission to require inspection under this Rule.(B) The owner of any dam which must be inspected by an independent consultant pursuant to regulation by the Federal Energy Regulatory Commission, or which is inspected for safety by employees or agents of the Federal Energy Regulatory Commission, may file with the Commission a copy of the report of such inspection. Unless otherwise determined by the Commission, such filing shall satisfy the inspection requirement of this Rule.(C) The owner of any dam included in the description set forth in subsection (A), but which is not inspected pursuant to Federal Energy Regulatory Commission regulations as defined in subsection (B), must file a report of an independent consultant as defined in the ensuing sections of this Rule.Section 4.523 Exemption (A) Upon written request from the owner or operator, the Commission may grant an exemption from the requirement for inspection (or any part of that requirement) in extraordinary circumstances that clearly establish good cause for exemption.(B) Good cause for exemption may include the finding that the dam in question meets the criteria for low hazard potential as defined by section 4.510(B).Section 4.524 Initial ReportsThe initial inspection and report under this rule shall be completed not later than:
(A) For dams which are inspected pursuant to Federal Energy Regulatory Commission rule, a copy of the most recent inspection report shall be filed within ninety days of the effective date of this Rule.(B) For dams not subject to federal inspection requirements:(1) For dams in the large size category or the high hazard class, two years from the effective date of this rule.(2) For all other dams to which the inspection requirement applies, three years from the effective date of this rule.Section 4.525 Time of Subsequent Inspections and Reports(A) General rule. After the initial inspection and report under this subpart, subsequent inspections under this subpart must be completed and the reports on them filed at the following intervals: (1) For dams which are inspected pursuant to Federal Energy Regulatory Commission rule, within thirty days of the availability of each scheduled inspection report.(2) For dams not subject to federal inspection requirements: (a) Five years for dams classed as large or high hazard under section 4.510;(b) Ten years for dams classed as medium or of significant hazard.(B) Extension of time. For good cause shown, the Commission may extend the time for filing an independent consultant's report under this subpart.Section 4.526 Specific Inspection RequirementsScope of inspection. The inspection by the independent consultant shall include:
(A) Due consideration of all relevant reports on the safety of the dam made by, or written under the direction of, federal or state agencies or made by other consultants;(B) Physical field inspection of the project works and review and assessment of all relevant data concerning:(9) Internal stress and hydrostatic pressures;(10) The functioning of foundation drains and relief wells;(11) The stability of critical slopes;(12) Regional and site geological conditions.(C) Specific evaluation of: (1) The effects of overtopping of non-overflow structures;(2) The structural adequacy and stability of structures under all credible loading conditions;(3) The relevant hydrological data accumulated since the dam was constructed or last inspected under this subpart;(4) The history of the performance of the dam through analysis of data from monitoring instruments; and(5) The quality and adequacy of maintenance, surveillance, and methods of operations for the protection of public safety.(D) Evaluation of spillway adequacy. The adequacy of any spillway must be evaluated by considering hazard potential which would result from failure of the project works during flood flows. (1) If structural failure would present a hazard to human life or cause significant property damage, the independent consultant must evaluate the ability of project works to withstand the loading or overtopping which may occur from a flood up to the probable maximum flood or the capacity of spillways to prevent the reservoir from rising to an elevation that would endanger the project works.(2) If structural failure would not present a hazard to human life or cause significant property damage, spillway adequacy may be evaluated by means of a design flood of lesser magnitude than the probable maximum flood, if the report of the independent consultant pursuant to subsection 4.527 provides a detailed explanation of the basis for the finding that structural failure would not present a hazard to human life or cause significant property damage.Section 4.527 Report of the Independent ConsultantGeneral requirement. Following inspection of a project development as required under this subpart, the independent consultant shall prepare a report, and the owner or operator shall file two copies of that report with the Commission. The report shall conform to the provisions of this section.
(A) General information in the initial report. The first report filed under this subpart for any dam shall contain:(1) A map of the region indicating the location of the dam;(2) Plans, elevations, and sections of the dam;(3) A summary of the design assumptions, design analyses, spillway design flood, and the factors of safety used to evaluate the structural adequacy and stability of the dam; and(4) A summary of the geological conditions that may affect the safety of the project works.(B) Information required for all reports. Any report of an independent consultant filed under this subpart shall contain the information specified in this paragraph:(1) Analyses. The report shall:(a) Analyze fully the safety of the dam and the maintenance and methods of operation of the development in light of the independent consultant's reviews, field inspections, assessments, and evaluations described in subsection 4.526;(b) Identify any changes in the information and analyses required by paragraph (a) of this subsection that have occurred since the last report by an independent consultant and analyze the implications of those changes; and(c) Analyze the adequacy of existing monitoring instruments, periodic observation programs, and other methods of monitoring project works and conditions affecting the safety of the project or project works with respect to the dam.(2) Recommendations. Based on the independent consultant's field observations and evaluations of the project works and the maintenance, surveillance, and methods of operations of the dam, the report shall contain the independent consultant's recommendations regarding: (a) Any corrective measures necessary for maintaining the integrity of the structures, for improving methods of operation of the dam, or for improving maintenance or surveillance procedures; and(b) A reasonable time to carry out each corrective measure.(3) Dissenting views. If the inspection and report were conducted and prepared by more than one independent consultant, the report shall clearly indicate the substance of any dissenting views concerning the analyses or recommendations of the report that may be held by any individual consultant.(4) List of participants. The report shall identify all professional personnel who have participated in the inspection of the project or in preparation of the report and shall identify the independent consultant who directed those activities.(5) Statement of independence. The independent consultant shall declare that all conclusions and recommendations in the report are made independently of the owner or operator and its employees and representatives.(6) Signature. The report shall be signed by each independent consultant responsible for the report.Section 4.528 ReviewEvery five years the Commission shall conduct a review of the exemptions of dams which have been exempted from periodic inspection pursuant to 4.522(A) or 4.523. Such review shall focus on changed conditions concerning each dam which may indicate that inspection ought to be required.
Section 4.530 Corrective MeasuresSection 4.531 Emergency Corrective MeasuresIf, in the course of an inspection, an independent consultant discovers any condition for which emergency corrective measures are advisable, the independent consultant shall immediately notify the owner or operator, and the owner or operator shall report that condition to the Commission and take corrective action as required under subsection 4.532.
Section 4.532 Taking Corrective Measures After the Report (A) Corrective plan and schedule. (1) Not later than sixty days after the report of the independent consultant is filed with the Commission, or fifteen days in the case of emergency corrective measures reported pursuant to 4.531, the owner or operator shall submit to the Commission two copies of a plan and schedule for designing and carrying out any corrective measures that the owner or operator proposes.(2) The plan and schedule may include any proposal, including taking no action, that the owner or operator considers a preferable alternative to any corrective measure recommended in the report of the independent consultant. Any proposed alternative must be accompanied by the owner or operator's complete detailed analysis and evaluation in support of that alternative.(B) Carrying out the plan. The owner or operator shall complete all corrective measures in accordance with the plan and schedule submitted to the Commission, as approved or modified by the Commission.(C) Notwithstanding the above, if corrective action is required by any federal agency, including the Federal Energy Regulatory Commission, and the owner or operator complies with the instructions provided by such federal agency, such compliance shall constitute sufficient action under this section.(D) Extension of time. For good cause shown, the Commission may extend the time for filing the plan and schedule required by this section.Section 4.540 On-going CareSection 4.541 Reporting of Safety-related Conditions (A) Oral report. An owner or operator shall report to the Commission by telephone any condition affecting the safety of a dam, as defined in subsection (C) of this section. The oral report shall be made as soon as practicable after that condition is discovered, without interfering with any necessary or appropriate emergency repair, alarm, or other emergency action.(B) Written report. Following the initial oral report required in subsection (A), the owner or operator shall submit to the Commission a written report on the condition affecting the safety of the dam. The written report shall be submitted within thirty days and shall contain such information as the Commission directs including: (1) The causes of the condition;(2) A description of any unusual occurrences or operating circumstances preceding the condition;(3) An account of any measure taken to prevent worsening of the condition;(4) A detailed description of any damage to the dam and the status of any repair;(5) A detailed description of any personal injuries;(6) A detailed description of the nature and extent of any property damages; and(7) Any other relevant information requested by the Commission.(C) "Condition affecting the safety of a dam" means any condition, event, or action which might compromise the safety, stability, or integrity of the dam or its ability to function safely for its intended purpose, or which might otherwise adversely affect life, health, or property. Conditions affecting the safety of a dam include, but are not limited to:(1) Unscheduled rapid draw-down of impounded water;(2) Failure of any facility that controls the release or storage of impounded water, such as a gate or a valve;(3) Failure or unusual movement, subsidence, or settlement of any part of a dam;(4) Unusual concrete deterioration or cracking, including development of new cracks or the lengthening or widening of existing cracks;(5) Piping, slides, or settlements of materials in any dam, abutment, dike, or embankment;(6) Significant slides or settlements of materials in areas adjacent to reservoirs;(7) Significant damage to slope protection;(8) Unusual instrumentation readings;(9) New seepage or leakage or significant gradual increase in pre-existing seepage or leakage;(11) Significant instances of vandalism or sabotage;(12) Natural disasters, such as floods or earthquakes;(13) Any other signs of instability.Section 4.542 Commission ActionOn the basis of any oral or written report made under this section, the Commission may order the owner or operator to take any action reasonably required to correct the condition or conditions reported. The Commission may retain a consultant to inspect any dam and, if the inspection reveals any unsafe condition which the owner or operator should have discovered and reported, may require the owner or operator to pay the cost of the inspection.
Section 4.543 Emergency Plans(A) The owner or operator of any dam which is required to maintain an emergency action plan by the Federal Energy Regulatory Commission shall file a copy of the Commission's approval letter for its most recent plan.(B) The copy of the emergency action plan approval letter shall be filed within sixty days of the adoption of this rule, or within thirty days of an owner's receipt of such letter, whichever is later.(C) The owner of a dam which is classified as high or intermediate hazard, but which is not required by the Federal Energy Regulatory Commission to maintain an emergency action plan, may be required by the Commission to develop a plan to protect lives and property downstream. Any plan so developed shall be filed with the Vermont Emergency Management Division.30-4500 Code Vt. R. 30-000-4500-X
EFFECTIVE DATE: November 14, 1986 Secretary of State Rule Log #86-73
AMENDED: January 8, 1990; December 2017 [agency name change from Public Service Board; rule renumbered from 30 000 014]STATUTORY AUTHORITY:
Statutory authority not provided.