Current through Bulletin 2024-23, December 1, 2024
Section R850-50-1100 - Range Improvement Projects1. Applications for range improvement projects shall be submitted for approval on appropriate forms and shall be approved or denied by the agency based on a written finding.2. A range improvement project must be approved by the agency in writing before construction begins. Line cabins and similar structures will not be authorized as range improvement projects. They may, however, be authorized by a special use lease pursuant to Rule R850-30.3. Agency authorization for range improvement projects shall be valid for periods of time not to exceed two years from the date the applicant is notified of the authorization. Extensions of time may be granted only when the director finds that an extension of time would be in the best interests of the beneficiaries.4. Range improvements constructed or placed upon trust land become the property of the agency.5. Range improvements shall not be authorized if they would be:(a) located on a parcel that the agency has determined has potential for sale, lease, or exchange and the possibility exists that improvements may encumber these actions;(b) located on a parcel designated for disposal;(c) unnecessary or uneconomical as determined by the agency; or(d) determined by the agency to be ordinary maintenance.6. Range improvements which are necessary to rehabilitate lands whose forage production has been diminished by poor grazing practices or poor stewardship of the permittee shall not be considered a reimbursable improvement but rather a requirement to keep the grazing permit in effect.7. Authorized Range Improvement Projects: (a) shall be depreciated using schedules consistent with typical schedules published by the USDA Natural Resources Conservation Service or any other depreciation schedules approved by the board; and(b) do not grant any vested property interest to the permittee.8. If the property, on which an approved range improvement is located is sold, exchanged, or withdrawn from use, the permittee shall receive no more than the amount the permittee contributed toward the original cost of the range improvement project, minus the indicated depreciation amount; or in the alternative, may be allowed 90 days to remove improvements pursuant to Subsection 53C-4-202(6).9. If the range improvement project is designed to increase carrying capacity, the permittee shall agree to pay for the increase in AUMs annually starting no later than two years after project completion. The agency may allow any increase in fees to be phased in at 20% per year.10. The agency may participate in the cost of designated range improvement projects, or maintenance of existing range improvement projects, by providing funding in amounts and at rates determined by the agency.11. The agency's cost or share portion of the project may be in the form of project materials. In these instances, the permittee shall be required to provide any necessary equipment and manpower to complete the project to specifications required by the agency.Utah Admin. Code R850-50-1100
Amended by Utah State Bulletin Number 2015-17, effective 8/11/2015Amended by Utah State Bulletin Number 2016-4, effective 1/21/2016Amended by Utah State Bulletin Number 2022-20, effective 10/11/2022