Current through Bulletin 2024-23, December 1, 2024
Section R850-24-400 - Preference Rights for Unleased Mineral or Material1. Any lessee or permittee who discovers any mineral or material on lands leased or permitted from the agency which are not included within that lease or permit shall have a preference right to a lease or permit covering the unleased mineral or unpermitted material, provided the unleased mineral or unpermitted material at the time of discovery is not included within a lease or permit application by another party.2. The preference right lease or permit is subject to the rental, royalty, and development requirements provided in these rules and in the lease or permit form.3. The preference right shall not extend to any unleased mineral or unpermitted material which have been withdrawn from leasing or permitting.4. The preference right shall continue for a period of 60 days after the discovery of the unleased mineral or unpermitted material, provided the applicant notifies the agency within ten (10) days after the discovery and makes application to lease the unleased mineral or permit the unpermitted material within the sixty (60) day period after date of discovery.Utah Admin. Code R850-24-400