All pits, excavations, roads and pads shall be shaped to facilitate drainage and control erosion by following the best management practices. In no case shall the pits or excavations be allowed to become a hazard to persons or livestock. All material removed from the disturbed area shall be stockpiled and be used to fill the pits and for leveling and reclamation of roads and pads, unless consent of the agency to do otherwise is obtained. At the termination of the lease, the land will as nearly as practicable approximate its original configuration. All drill holes must be plugged in accordance with rules promulgated by UDOGM. All mud pits shall be filled and materials and debris removed from the site.
All topsoil in the affected area shall be removed, stockpiled, and stabilized on the leased trust lands until the completion of operations. Upon reclamation, the stockpiled topsoil will be redistributed on the affected area and the land revegetated as prescribed by the agency.
Utah Admin. Code R850-21-700