Any Secondary Material considered for a Secondary Recovery Process may not be located on sovereign lands or within evaporation ponds associated with Great Salt Lake mineral extraction.
Utah Admin. Code R652-21-401
Any Secondary Material considered for a Secondary Recovery Process may not be located on sovereign lands or within evaporation ponds associated with Great Salt Lake mineral extraction.
Utah Admin. Code R652-21-401