Utah Admin. Code 647-4-113

Current through Bulletin 2024-23, December 1, 2024
Section R647-4-113 - Surety
1. After receiving notification that the notice of intention has been approved, but prior to commencement of operations, the operator shall provide the reclamation surety to the Division. Failure to furnish and maintain reclamation surety may, after notice and opportunity for Board hearing, result in a withdrawal of the approved notice of intention as provided for in Section 40-8-16.
2. The Division will not require a separate surety when a reclamation surety in a form and amount acceptable to the Division is held by other governmental entities, provided that the cost estimate is accurate and the Division is named as co-beneficiary. Cooperative Agreements will be developed and entered into according to Section 40-8-22.
3. As part of the review of the notice of intention, the Division shall determine the final amount of surety required to reclaim the mine site. The surety amount will be based upon (a) the technical details of the approved mining and reclamation plan, (b) the proposed post mining land use, and (c) projected third party engineering and administrative costs to cover Division expenses incurred under a bond forfeiture circumstance. An operator's surety estimate will be accepted if it is accurate and verifiable. The Division may accept surety estimates based upon the Minerals Reclamation Program's average dollars per acre reclamation costs, if comparable to site specific cost estimates for similar operations.
4. The operator shall submit a completed Reclamation Contract (FORM MR-RC) with the required surety. The form and amount of the surety must be approved by the Division, except as provided in subpart 4.16. Acceptable forms may include:
4.11. A corporate surety bond from a surety company that is licensed to do business in Utah, that is listed in "A.M. Best's Key Rating Guide" at a rating of A- or better or a Financial Performance Rating (FPR) of 8 or better, according to the "A.M. Best's Guide". All surety companies also will be continuously listed in the current issue of the U.S. Department of the Treasury Circular 570. Operators who do not have a surety bond with a company that meets the standards of subsection 4.11 will have 120 days from the date of Division notification after enactment of the changes to subsection 4.11 to achieve compliance or face enforcement action. When the Division in the course of examining surety bonds, notifies an operator that a surety company guaranteeing its performance does not meet the standards of subsection 4.11., the operator has 120 days after notice from the Division by mail to correct the deficiency, or face enforcement action;
4.12. Federally-insured certificate of deposit payable to the State of Utah, Division of Oil, Gas and Mining;
4.13. Cash;
4.14. An irrevocable letter of credit issued by a bank organized to do business in the United States;
4.15. Escrow accounts.
4.16. The Board may approve a written self-bonding agreement in the case of operators showing sufficient financial strength.
5. Surety shall be required until such time as reclamation is deemed complete by the Division. The Division shall promptly conduct an inspection when notified by the operator that reclamation is complete. The full release of surety shall be evidence that the operator has reclaimed as required by the Act.
5.11. A partial release of surety can be made by the Division if it determines that a substantial phase or segment of reclamation such as demolition, backfilling, regrading or vegetation establishment has been successfully performed and the residual amount of retained surety is determined adequate to insure completion of reclamation.
6. The amount of reclamation surety may be adjusted:
6.11. If required to address changes in the reclamation plan due to an amendment or revision to the Notice of Intention under R647-4-118 and R647-4-119;
6.12. As the result of a periodic review by the Division conducted no more frequently than at 5 year intervals unless agreed to by the operator; which shall take into account inflation/deflation based upon an acceptable Costs Index; or
6.13. At the request of the operator.
7. Notwithstanding any other provision of these rules, for operations where the surety is in the form of a Board-approved agreement under Section 40-8-14(3), the Board shall retain the sole authority over the release, partial release, revision or adjustment of the surety amount, if any, which shall be in accordance with the agreement and the Act.

Utah Admin. Code R647-4-113

Amended by Utah State Bulletin Number 2020-04, effective 2/10/2020